This renovation was due partly to the customer having a central heating system that was leaking, which resulted in the flooring giving away and needing replacing.
Pictures 1 and 2 show a bathroom before work has started. Picture 3 shows the room has been stripped and the walls are being prepared ready for the tiling. Picture 4 shows the bath has been installed in a bath surround and the surround tiled. (Photo taken in same position as photo 1). Picture 5 shows furniture installed under window.